Din avgränsning ger 144 träffar.
-
2012:58 Technical Note, Independent radionuclide transport modelling – Reproducing results for main scenarios
As part of the initial technical review of SR-Site, we applied a simplified model to approximate Swedish Nuclear Fuel and Waste Management Company (SKB) computations related to the transport of radionuclides at the planned KBS–3 repository at the Forsmark site in Sweden. The objective was to provide insights and recommendations to the Swedish Radiation Safety Authority (SSM) on potential...
Innehållstyp: Publikationer -
2012:60 Technical Note, Handling of climate related issues in the safety assessment SR-Site
The application is based on research carried out over several decades and is an impressive compilation of data and knowledge of the site of Forsmark. The sections on climate, glaciations and permafrost have developed continuously through the earlier compilations reported (e.g. the SR-97-reports). Much has been improved over the years while new question marks have occurred and some known...
Innehållstyp: Publikationer -
2012:55 Technical Note, Review of SKB’s Radionuclide Transport Methodology
As part of SSM’s Initial Review Phase of SKB’s SR-Site safety assessment of the final disposal of spent nuclear fuel at the Forsmark site, Quintessa has been requested by SSM to consider whether SKB’s methodology to abstract FEPs (features, events, processes), as well as site information and other data, into assessment models for radionuclide transport is appropriate and sufficient for its...
Innehållstyp: Publikationer -
2012:68 Assessment of cost for dismantling of Ringhals 2 PWR
The Financing Act stipulates that future expenses for dismantling of Nuclear Power Plants (NPP) shall be financed from segregated funds that are supervised by the Swedish Nuclear Waste Fund (SNWF). Transparency of and confidence in the process to ensure collection of sufficient funds is fundamental for the acceptance and sustainability of the Swedish model for estimating environmental...
Innehållstyp: Publikationer -
2012:62 Technical Note, Review of the MARFA Code
As part of SSM’s Initial Review Phase of SKB’s SR-Site safety assessment of the final disposal of spent nuclear fuel at the Forsmark site, Quintessa has been requested by SSM to review SKB’s MARFA code and consider whether the technical arguments and assumptions used for developing the code are sound, appropriate and adequate to support its use in SR-Site. This Technical Note summarises the...
Innehållstyp: Publikationer -
2012:27 Mental arbetsbelastning En fallstudie från projektorganisationen på ett svenskt kärnkraftverk
Den genomförda studien har fokuserat på den personal som arbetar inom projektorganisationen och är en intervjustudie för att kartlägga den mentala arbetsbelastningen och de risker som finns relaterade till denna. Vidare har studien endast omfattat ett svenskt kärnkraftverk, som därmed får illustrera de faktorer som kan bidra och bidrar till den mentala arbetsbelastningen...
Innehållstyp: Publikationer -
2012:50 Fatigue Margins for Austenitic Stainless Steels in ASME Boiler and Pressure Vessel Code – A Literature Study
Knowledge about the margins against fatigue failure in nuclear piping systems is essential. Therefore, the margins in the ASME Boiler and Pressure Vessel Code (section III) fatigue design procedure for austenitic steels, type 304/316, as applied to real components have been investigated in this literature study. It is concluded that the current knowledge about the margins in ASME for...
Innehållstyp: Publikationer -
2012:01 Kontrollrumskonstruktion – Samverkan mellan olika aktörer under konstruktion av nya och moderniserade kontrollrum
SSM har under senare år ställt högre krav på konstruktion och utformning av kärnkrafts-anläggningarna. Detta tillsammans med kärnkraftsindustrins uppgraderingar av effekten har medfört ett stort antal anläggningsändringar. En del av dessa anläggningsändringar har påverkan på kontrollrum och manöverutrustning samt på...
Innehållstyp: Publikationer -
2012:16 El och kontrollutrustning i kärnkraftverk. Problematik vid utbyte av åldrad utrustning
Studien visar på ett flertal områden som bör beaktas både hos tillståndshavarna och för framtida tillsynsstrategier för SSM. Flera av områdena har betydelse för säkerheten. Till exempel så framgår att konstruktionsprocessens efterlevnad och genomförande är mycket viktig för säkerheten. Genom att el- och kontrollutrustningen...
Innehållstyp: Publikationer -
2012:07 Implementation of the Master Curve method in ProSACC
Cleavage fracture toughness data display normally large amount of statistical scatter in the transition region. The cleavage toughness data in this region is specimen size-dependent, and should be treated statistically rather than deterministically. The Master Curve (MC) methodology is a procedure for mechanical testing and statistical analysis of fracture toughness of ferritic steels in the...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
- Sida: 2
- …
- Sida: 9
- Sida: 10
- Sida: 11
-
12 (nuvarande sida)
- Sida: 13
- Sida: 14
- Sida: 15
- Nästa sida