Din avgränsning ger 332 träffar.
-
2011:03 On Decommissioning Cost for Nuclear Power Plants
This research report summarizes what has changed over the latest 15 years concerning actual and estimated costs for the D&D of nuclear power plants that have been shut down permanently. It also reports on the availability of detailed information for actual nuclear power plant D&D cost breakdowns. The results will be one supporting document in the review of the estimates submitted for...
Innehållstyp: Publikationer -
2017:27 Översyn av beredskapszoner
Sammanfattning Den 22 oktober 2015 gav regeringen Strålsäkerhetsmyndigheten (SSM) i uppdrag att, i samråd med Myndigheten för samhällsskydd och beredskap (MSB), berörda länsstyrelser samt andra berörda myndigheter och aktörer, genomföra en översyn av de beredskapszoner som gäller för verksamheter med joniserande strålning. SSM...
Innehållstyp: Publikationer -
2011:34 Evolution of hydrogen by copper in ultrapure water without dissolved oxygen
One result from this research was that the experimental difficulties of repeating Hultqvist and co-workers work are considerable and were initially underestimated. The main challenge was to obtain satisfactory tightness of all connectors involved in the experimental set-up. The problems with leakage resulted in that the research program originally planned for in this project had to be reduced...
Innehållstyp: Publikationer -
2007:09 DECOVALEX-THMC - Task C
This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...
Innehållstyp: Publikationer -
2008:12 Independent Calculations for the SRCan Assessment
External review contribution in support of SKI's and SSI's review of SR-Can The work presented in this report is part of the Swedish Nuclear Power Inspectorate’s (SKI) and the Swedish Radiation Protection Authority’s (SSI) SR-Can review project. The Swedish Nuclear Fuel and Waste Management Co (SKB) plans to submit a license application for the construction of a repository for spent nuclear...
Innehållstyp: Publikationer -
2007:07 DECOVALEX-THMC Project - Task A
This report presents the definition of the first phase, Task A-1, of the Task A of the international DECOVALEX project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the...
Innehållstyp: Publikationer -
2007:21 On tentative decommissioning cost analysis with specific authentic cost calculations with the application of the Omega code on a case linked to the Intermediate storage facility for spent fuel in Sweden
The aim of this applied study has been to demonstrate how a cost calculation is done in a systematic way. The framework of the project has been limited to older nuclear installations in Sweden. Furthermore, it may be envisaged that the process of making regular estimates of all the parameters is crucial in preparatory phases of decommissioning and dismantling processes. A secondary aim of the...
Innehållstyp: Publikationer -
2007:03 Variability and Uncertainties of Key Hydrochemical Parameters for SKB Sites
An important part of the site investigations conducted by the Swedish Nuclear Fuel and Waste Management Company (SKB) is the characterisation of groundwater chemical conditions in the deep bedrock environment where a final repository for spent nuclear fuel is planned to be located. This work is currently in its final stages at the two candidate sites, Forsmark and Laxemar, and should be...
Innehållstyp: Publikationer -
2007:02 Stakeholder involvement in Swedish nuclear waste management
This report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden’s spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, in something more like a patchwork of different shapes and forms. Some of the...
Innehållstyp: Publikationer -
2007:32 Low pH Cements
Concrete and cement are used in constructions as well as in conditioning of waste in repositories for radioactive waste. The development of low pH cements for use in geological repositories for radioactive waste stem from concerns over the potential for deleterious effects upon the host rock and other EBS materials (notably bentonite) under the hyperalkaline conditions (pH > 12) of cement...
Innehållstyp: Publikationer
Gå till sida:
- Föregående sida
- Sida: 1
-
2 (nuvarande sida)
- Sida: 3
- Sida: 4
- Sida: 5
- Sida: 6
- Sida: 7
- …
- Sida: 33
- Sida: 34
- Nästa sida