  • 2012:68 Assessment of cost for dismantling of Ringhals 2 PWR

    The Financing Act stipulates that future expenses for dismantling of Nuclear Power Plants (NPP) shall be financed from segregated funds that are supervised by the Swedish Nuclear Waste Fund (SNWF). Transparency of and confidence in the process to ensure collection of sufficient funds is fundamental for the acceptance and sustainability of the Swedish model for estimating environmental...

    Innehållstyp: Publikationer
  • 2012:41 Technical Note, Hydrogeological conditions at the Forsmark site

    The hydrogeological site description and groundwater models employed in support of SR-Site, in many ways, represent advances in the state of the art for crystalline bedrock where groundwater moves mainly through fractures. Advanced methods are used for representing water-conducting natural features on scales from kilometres down to a meter, as well as excavated portions of the repository...

    Innehållstyp: Publikationer
  • 2012:38 Technical Note, Radiological effects on non-human biota - initial review

    The focus of this review was SKB’s assessment of radiological effects on non-human biota in SR-Site according to present regulations and guidance from SSM and it was conducted by Karolina Stark at the Department of Systems Ecology, Stockholm University. In short, the results from this review show that the completeness of the safety assessment can be questioned regarding considered...

    Innehållstyp: Publikationer
  • 2018:08 Calculated radiological consequences of applying European clearance levels to scrap metal from the decommissioning of Swedish nuclear facilities

    Background Many practices involving radioactive substances generate materials with potential or known radioactive contamination. Clearance of materials means a decision that such materials can be released from regulatory control and used or disposed of without restrictions from a radiation protection point of view. According to regulations issued by the SSM, such decisions must be based on...

    Innehållstyp: Publikationer
  • 2004:16e Statement of the Situation Concerning Safety and Radiation Protection at Swedish Nuclear Plants in 2003

    The safety philosophy upon which the Swedish Nuclear Power Inspectorate’s (SKI) supervisory and regulatory activities are based assumes that multiple physical barriers will exist and that a plant-specific defence-in-depth system will be implemented at each plant. The physical barriers are situated between the radioactive material and the plant personnel and surroundings. In the case of...

    Innehållstyp: Publikationer
  • 2008:34 Utformning av larmsystem i svenska kärnkraftverk

    Det pågår flera stora moderniseringsprojekt inom den svenska kärnkraftindustrin. En del i dessa projekt består av att man helt eller delvis byter ut analoga informations- och manöversystem i kontrollrummen till digitala vilket förändrar larmsystemen. Digitala larmsystem har en mängd fördelar men kan också medföra risker och negativ säkerhetspåverkan.

    Innehållstyp: Publikationer
  • 2009:13e 2009 assessment of radiation safety in the Swedish nuclear power plants

    This report has been prepared by order of the Swedish government in accordance with the “Governmental directive for the financial year 2009 regarding the Swedish Radiation Safety Authority”. The Swedish Radiation Safety Authority has through its supervision ensured a comprehensive basis for this overall assessment of radiation safety. The overall conclusion is that the radiation safety,...

    Innehållstyp: Publikationer
  • 2009:10 Regleringen av matarvattenflödet i en BWR. Med exempel från Forsmark 2

    Säkerheten i kärntekniska anläggningar ska upprätthållas genom att radiologiska olyckor förebyggs. I reaktorer sker detta genom att det finns flerfaldiga barriärer och ett så kallat djupförsvar. I djupförsvaret ingår att åtgärder vidtas för att tillförsäkra lugn och störningsfri drift utan transienter som kan...

    Innehållstyp: Publikationer
  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...

    Innehållstyp: Publikationer
  • 2007:39 Influence of Crack Morphology on Leak Before Break Margins

    The SKI regulation SKIFS 2004:2 allows for the use of Leak Before Break (LBB) as one way to provide assurance that adequate protection exists against the local dynamic consequences of a pipe break. The way to demonstrate that LBB prevails relies on a deterministic procedure for which a leakage crack is postulated in certain sections of the pipe based on the leak detection capability of the...

    Innehållstyp: Publikationer