  • SSM Report 2008:01 A combined deterministic and probabilistic procedure for safety assessment of components with cracks – Handbook

    SSM has supported research work for the further development of a previously developed procedure/handbook (SKI Report 99:49) for assessment of detected cracks and tolerance for defect analysis. During the ... Weilin Zang, Iradj Sattari-Far, Peder Andersson, Göran Sund, Lars Dahlberg and Fred Nilsson SSM English SSM has supported research work for the further development of a previously developed procedure/handbook...

    Innehållstyp: Publikationer
  • 2008:03 Myndigheternas granskning av SKB:s preliminära säkerhetsbedömningar för Forsmark och Laxemar

    dokument redovisar SKI:s och SSI:s granskning av SKB:s preliminära säkerhetsbedömningar för Forsmark och Laxemar. Myndigheternas syfte med denna granskning är att bedöma om SKB:s inledande platsundersökningar ... dokument redovisar SKI:s och SSI:s granskning av SKB:s preliminära säkerhetsbedömningar för Forsmark och Laxemar. Myndigheternas syfte med denna granskning är att bedöma om SKB:s inledande platsundersökningar...

    Innehållstyp: Publikationer
  • Vid larm från Ringhals kärnkraftverk – det här behöver du veta

    SSM Svenska...

    Innehållstyp: Publikationer
  • 2014:55 Technical Note, Further Reproduction of SKB’s Calculation Cases and Independent

    antaganden. Inom detta uppdrag har en oberoende reproducering gjorts av SKB:s beräkningsfall och resultaten har granskats, för att ge SSM ett oberoende perspektiv på den roll som barriärerna i närområdet kan ... kan tillhandahålla för säkerheten. Analysen innebar användning av SKB:s underlag för att återskapa radionuklidtransportmodellerna med en annan datorkod; AMBER. En betydande del av tolkning och anpassning...

    Innehållstyp: Publikationer
  • 2019:20 Assessment of structures subject to concrete pathologies (ASCET), phase 3

    SSM perspective Background ASCET is an international research project initiated by WGIAGE1 OECD2 / NEA3. WGIAGE Concrete subgroup is a working group within the OECD / NEA whose task is to address issues ... reinforcement to the concrete. The numerical simulations showed that the model can have a significant impact on crack-pattern, failure mode and ductility, failure load capacity is relatively independent of the bond...

    Innehållstyp: Publikationer
  • 2015:10 SafePhase: Safety culture challenges in design, construction, installation and commissioning phases of large nuclear power projects

    large-scale nuclear power projects. The study utilized relevant literature and international experience on challenges in design, construction, installation and commissioning phases. Background information was ... also reviewed, although this was beyond the scope of the study. Nadezhda Gotcheva and Pia Oedewald SSM English Different lifecycle phases of a nuclear power plant present new human-technology- organization...

    Innehållstyp: Publikationer
  • 2014:18 Evaluation of the Halden IFA-650 loss-of-coolant accident experiments 2, 3 and 4

    Quantum Technologies AB use and develop, contain models of several of the phenomena that are acting on the nuclear fuel (cladding temperature, fission gas driven pressure, strain and stress in the cladding ... Jan-Olof Stengård SSM English The analytical tools, which are fuel rod computer codes, that Quantum Technologies AB use and develop, contain models of several of the phenomena that are acting on the nuclear...

    Innehållstyp: Publikationer
  • 2017:29 Evaluation of the simulation software CIVA for qualification purpose

    testing technologies, but also within the Qualification Body’s activities to assess technical verifications and perform parameter studies. SSM has supported university research in the area for many years ... by the material structure can be modelled in CIVA but as a separate layer, which is super positioned on top of the defect response simulation, meaning that the defect response is not affected by the noise...

    Innehållstyp: Publikationer
  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland ... safety goals defined on diffe- rent levels, e.g., for core damage and for unacceptable release. The results from the project can be used as a platform for discussions at the utilities on how to define and...

    Innehållstyp: Publikationer
  • Strålsäkerhetsvärdering 2021: Acceptabel strålsäkerhet på Forsmark

    Strålsäkerheten på Forsmark Kraftgrupp AB:s tre reaktorer i Forsmark är acceptabel. Det konstaterar Strålsäkerhetsmyndigheten i årets samlade strålsäkerhetsvärdering. ... Strålsäkerheten på Forsmark Kraftgrupp AB:s tre reaktorer i Forsmark är acceptabel. Det konstaterar Strålsäkerhetsmyndigheten i årets samlade strålsäkerhetsvärdering.