Din avgränsning ger 6 träffar.

Sortera på:

Relevans Datum
  • 2007:06 Probabilistic Safety Goals - Phase 1 -Status and Experiences in Sweden and Finland

    Based on a series of interviews and on literature reviews as well as on a limited interna- tional over-view, the project has described the history and current status of safety goals in Sweden and Finland. A number of issues were discussed more in detail, including the status of the safety goals in view of the fact that they are often exceeded, strategies for handling violations of safety...

    Innehållstyp: Publikationer
  • 2007:41 Dependency Analysis Guidence, Nordic/German Working Group on Common cause Failure analysis Phaase 1 project report: Comparison and application to test cases

    The report “Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases” presents a common attempt by the authorities and the utilities ... component impairments, time differences and shared cause assessment. Following the conclusions of phase 1 it was decided to proceed with a second phase of the project. The objectives for phase 2 wibe to establish...

    Innehållstyp: Publikationer
  • 2007:05 Development of an Input Model to MELCOR 1.8.5 for Oskarshamn 3 BWR

    nominal operating conditions in Oskarshamn 3 for 3300 MW thermal power, were performed for three cases: (1) initial, steady-state conditions, (2) total loss of AC power and (3) large steam line LOCA. The results ... nominal operating conditions in Oskarshamn 3 for 3300 MW thermal power, were performed for three cases: (1) initial, steady-state conditions, (2) total loss of AC power and (3) large steam line LOCA. The results...

    Innehållstyp: Publikationer
  • 2007:31 Säkerhets- och strålskyddsläget vid de svenska kärnkraftverken 2006

    Säkerhetsproblemen i el-systemen vid reaktor Forsmark 1 var den dominerande händelsen i de svenska kärntekniska anläggningarna under 2006. Händelsen har fått stor betydelse för synen på tillförlitligheten ... ställt Forsmarksverket under s.k. särskild tillsyn1. I ett kompletterande yttrande till regeringen den 1 november 2006 informerade SKI även att för det fall regeringen skulle bevilja Forsmarks Kraftgrupps...

    Innehållstyp: Publikationer
  • 2007:31e Safety and Radiation Protection at Swedish Nuclear Power Plants 2006

    Safety related problems in the electric systems of the Forsmark 1 reactor were the dominant event in Swedish nuclear power plants in 2006. The incident has had a significant impact on our attitude towards ... led to SKI placing Forsmark under intensified “special supervision”1. In a complementary recommendation to the government SKI on November 1 2006, SKI informed the government that in the event of approval...

    Innehållstyp: Publikationer
  • 2007:07 Inquiry into the radiological consequences of power uprates at light-water rectors worldwide

    to established criteria, in line with the project requirements. The selected plants were Olkiluoto 1 and 2, Cofrentes, Asco and Tihange. The plants were selected with design and operation conditions close ... to established criteria, in line with the project requirements. The selected plants were Olkiluoto 1 and 2, Cofrentes, Asco and Tihange. The plants were selected with design and operation conditions close...

    Innehållstyp: Publikationer