Din avgränsning ger 120 träffar.
-
2012:55 Technical Note, Review of SKB’s Radionuclide Transport Methodology
As part of SSM’s Initial Review Phase of SKB’s SR-Site safety assessment of the final disposal of spent nuclear fuel at the Forsmark site, Quintessa has been requested by SSM to consider whether SKB’s methodology to abstract FEPs (features, events, processes), as well as site information and other data, into assessment models for radionuclide transport is appropriate and sufficient for its...
Innehållstyp: Publikationer -
2012:38 Technical Note, Radiological effects on non-human biota - initial review
The focus of this review was SKB’s assessment of radiological effects on non-human biota in SR-Site according to present regulations and guidance from SSM and it was conducted by Karolina Stark at the Department of Systems Ecology, Stockholm University. In short, the results from this review show that the completeness of the safety assessment can be questioned regarding considered...
Innehållstyp: Publikationer -
2012:28 Technical Note, Initial review of chemical and erosional processes within the buffer and backfill – Geochemical processes
This report consists of a Technical Note in SSM’s initial review phase of SKB’s safety analysis SR-Site. The aim of the initial review of issues concerning geochemical processes in buffer and backfill in a final repository is to make a broad illustration and review of SR-Site together with its subordinate references, as well as to identify potential needs for complementary information or...
Innehållstyp: Publikationer -
2012:52 Technical Note, Shear movement of near-field rock due to large earthquakes
The review assignment concentrates on the possible impact of large earthquakes on the shear deformation of large fractures in the repository volume. For this purpose a general review of some of SKB‘s top-level reports was carried out. The reports draw a generally consistent and to a considerable extend comprehensive picture of the potential impact on the repository integrity in case of the...
Innehållstyp: Publikationer -
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the main review ... gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the main review...
Innehållstyp: Publikationer -
2012:32 Technical Note, Groundwater Chemistry in SKB’s Safety Assessment SR-Site: Initial Review
This preliminary review of SR-Site is focused specifically on the treatment of groundwater chemistry in the description of the Forsmark site and in the long-term safety of a deep geological repository at Forsmark. Data for the chemical and isotopic compositions of groundwaters have contributed to a site descriptive model (SDM) for Forsmark. In that SDM, groundwater chemistry is interpreted...
Innehållstyp: Publikationer -
2012:53 Technical Note, Review of Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site – Initial Review Phase
SRK Consulting (UK) Limited (SRK) has reviewed the Engineering Geology and Rock Engineering aspects of the operation and closure of a KBS-3 repository at the Forsmark site in Sweden. The review assignment is part of a Swedish Radiation Safety Authority (SSM) Initial Review Phase. The review was carried out by David Saiang (PhD) on behalf of SRK. Therefore some of the views expressed in the...
Innehållstyp: Publikationer -
2014:40 Technical Note, Review of Performance Confirmation Programs and Potential Roles in SSM’s Current Review of SKB’s License Application – Main Review Phase
there is no specific mention or requirement for ‘performance confirmation’ in Swedish regulations, SSMFS 2008:1 Chapter 2, Section 10 states requirements on a safety program that calls for a continuous systematic ... there is no specific mention or requirement for ‘performance confirmation’ in Swedish regulations, SSMFS 2008:1 Chapter 2, Section 10 states requirements on a safety program that calls for a continuous systematic...
Innehållstyp: Publikationer -
2012:34 Technical Note, Review of FEP Handling in the SR-Site Safety Assessment: Initial Review Phase
On 16th March 2011 the Swedish Nuclear Fuel and Waste Management Company, SKB, submitted applications for licences to construct a spent nuclear fuel encapsulation facility in Oskarshamn and a repository for final disposal of the encapsulated fuel in Forsmark. SKB’s applications are currently being reviewed by the Swedish Radiation Safety Authority, SSM, and the Land and Environmental Court in...
Innehållstyp: Publikationer -
2012:36 Technical Note, Documentation and Traceability of Data in SKB’s Safety Assessment SR-Site: Initial Review Phase
On 16th March 2011SKB applied for a licence to construct and operate a spent nuclear fuel encapsulation facility in Oskarshamn Municipality and a final repository for the encapsulated fuel at Forsmark in Östhammar Municipality. SKB’s SR-Site safety assessment for the spent fuel repository is currently being reviewed by the Swedish Radiation Safety Authority, SSM, and its external experts...
Innehållstyp: Publikationer