Din avgränsning ger 2171 träffar.
-
Decommissioning Study of Clink.pdf
Pu-240 4,5E-06 Pu-241 9,0E-05 Am-241 2,6E-06 Am-243 2,1E-07 Cm-242 5,1E-28 Cm-244 4,7E-06 Sr-90 1,7E-02 I-129 2,0E-06 Cs-134 3,5E-05 Cs-137 2,6E+00 SKB R-13-36 41 The following assumptions and/or extrapolations ... Electrical Equipment and Cabling, including cables, cable trays and conduits, as well as all electrical and I&C significant equipment. These categories have been defined in this way to reflect the structure of...
Innehållstyp: Dokument -
2023:10 General data in accordance with the requirements in Article 37 of the Euratom Treaty
nuclide-specific content of radioactive substances in year 2075 h. Surface dose rate with reference date, and i. Deposition position 37 7. No later than three months before a planned deposit, a report ... respective nuclide's Kd value, [15] gives the following equation for the proportion of activity of nuclide i which is leached from the repository each year: 𝐴𝑐𝑡𝑖𝑣𝑖𝑡𝑦 𝑓𝑟𝑎𝑐𝑡𝑖𝑜𝑛 𝑙𝑒𝑎𝑐ℎ𝑒𝑑...
Innehållstyp: Dokument -
2001:11 Ethical Problems in Radiation Protection
standarder. SSI rapport : 2001:11 maj 2001 ISSN 0282-4434 Författarna svarar själva för innehållet i rapporten. The conclusions and viewpoints presented in the report are those of the author an do not ... In: Hook, S. ed. Law and philosophy. New York: New York University Press; 1964:35-36. Berlin, I. Equality. In: Hook, S. ed. Law and philosophy. New York: New York University Press; 1964:33. Berman...
Innehållstyp: Dokument -
2005:20 DECOVALEX III PROJECT Modelling of FEBEX In-Situ Test
cross section (E1, E2, D1, D2, etc., with some sections have a single letter designation (L, N, G, H, I)), and m identifies the number of the borehole drilled in Section An. A maximum of 4 boreholes were ... 36 15 632 7.2.1 Temperature T-type thermocouples were installed at different positions I the boreholes (other temperature sensors were integrated into other instruments for the sensors of...
Innehållstyp: Dokument -
02:02 R2/R0-WTR Decommissioning Cost Comparison and Benchmarking Analysis (pdf 577 kb)
research reactors are reasonable. The associated work was performed in two phases. The objective in Phase I was to make global comparisons of the R2 and Ågesta decommissioning estimates with the estimates/actual ... for the decommissioning of similar research reactors in other countries. In January 2001, the Phase I results were presented in the report, "Comparisons of Cost Estimates for the Decommissioning of Nuclear...
Innehållstyp: Dokument -
2012:23e Integrated assessment of radiation safety in health and medical services
1119 kB ... Council f) Halland County Council g) Värmland County Council h) Västmanland County Council i) Kronoberg County Council SSM 2012:23e 4 SSM 2012:23e 5 2. Ionising radiation ... 2007/458-210) g) Värmland County Council (SSM 2009/2218) h) Västmanland County Council (SSM 2009/4521) i) Kronoberg County Council (SSM 2010/2475) SSM 2012:23e 30 Definitions Audit A systematic...
Innehållstyp: Dokument -
2010:17 Quality Assurance Review of SKB’s Copper Corrosion Experiments
3518 kB ... Karnland (Clay Technology) and Nick Smart (Serco Technical Services). SSM 2010:17 i Executive Summary SKB intends to submit to the Swedish Radiation Safety Authority, SSM, an application ... Technology and Metallurgy, Sofia, Bulgaria. SSM 2010:17 8 o Spectroscopic studies of Cu(I) species are being carried out to obtain data to support first principles calculations. The techniques...
Innehållstyp: Dokument -
2002:25 Development of a High Sensivity Digital Cerenkov Viewing Device (pdf 4,20 MB)
4306 kB ... ISRN SKI-R-02/25-SE CSSP TASK ID: DV011 IAEA TASK: JNT/A704 CSSP Report 123 SKI Report 02:25 i CANADIAN NUCLEAR SAFETY COMMISSION AND SWEDISH NUCLEAR POWER INSPECTORATE DISCLAIMER The information ... Page 22 of 32 0 20 40 60 80 100 120 0 2 4 6 8 10 12 14 16 Cooling Time (years) Pi xe l I nt en si ty (c ou nt s) Figure 20: Measured pixel intensities for 4 PWR fuel assemblies plotted...
Innehållstyp: Dokument -
2016:39 Recommended residual stress profiles for stainless steel pipe welds
4844 ... be calculated from welding process parameters as: (Eq. 2) where U the voltage, I is the current and v is the arc travel speed (welding speed). The thermal efficiency for Tungsten Inert ... Brickstad, and L. Josefson, "Residual Stresses in Multi-Pass Butt-Welded Bimetallic Piping, Part I," SAQ FoU- Report 98/12,. [4] P. Delfin, B. Brickstad, and J. Gunnars, "Residual Stresses in Multi-Pass...
Innehållstyp: Dokument -
2009:04 Radon in DWELLINGS in the Republic of Kalmykia. Results from the National Radon Survey 2006-2007
1387 kB ... Baysson H, Bochicchio F,. Deo H,. Falk R, Forastiere F, Hakama M, Heid I, Kreienbrock L, Kreuzer M, Lagarde F, Mäkeläinen I, Muirhead C, Oberaigner W, Pershagen G, Ruano-Ravina A, Ru- osteenoja E, Schaffrath...
Innehållstyp: Dokument