Din avgränsning ger 562 träffar.
-
2018:18 Procedure for Safety Assessment of Components with Defects
Distribution. Research 2009:26, Tillämpning av stabil spricktillväxt vid brottmekanisk bedömning av defekter i sega material. Research 2009:27, Analysis Strategy for Fracture Assessment of Defects in Ductile Materials ... the NRC International Round Robin Study. Research 2015:03, Brottmekaniska K-lösningar för sprickor i massiv stång med icke-linjärt rotationssymmetriskt spänningstillstånd. Research 2016:35, Säkerhetsvärdering...
Innehållstyp: Publikationer -
2012:68 Assessment of cost for dismantling of Ringhals 2 PWR
the present interim estimates made by SKB for Ringhals-2 dismantling probably are on the lower side i.e. there is a risk that the estimated future cost for dismantling of Ringhals-2 may be underestimated ... the present interim estimates made by SKB for Ringhals-2 dismantling probably are on the lower side i.e. there is a risk that the estimated future cost for dismantling of Ringhals-2 may be underestimated...
Innehållstyp: Publikationer -
2009:22 Alternative modelling of brittle structures in a sub-area of the SKB candidate area at Forsmark, eastern Sweden
A reasonable understanding of the character of the bedrock hosting a deep geological repository, i.e. the natural barrier, is an important component in the safety assessment of the deep geological repository ... English A reasonable understanding of the character of the bedrock hosting a deep geological repository, i.e. the natural barrier, is an important component in the safety assessment of the deep geological repository...
Innehållstyp: Publikationer -
2014:10 Technical Note, Rock Mechanics - Confidence of SKB’s models for predicting the occurrence of spalling – Main Review Phase
proposed by SKB (referred to as “most likely”) is unlikely from a structural-geomechanical perspective, i.e. it is inconsistent with strength parameters of the rock mass provided by SKB; however, SKB’s model ... proposed by SKB (referred to as “most likely”) is unlikely from a structural-geomechanical perspective, i.e. it is inconsistent with strength parameters of the rock mass provided by SKB; however, SKB’s model...
Innehållstyp: Publikationer -
2013:10 Qualification of Electrical Equipment in Nuclear Power Plants - Management of ageing
The purpose of this report is to describe programs ... given in Part 2. This report is also available in Swedish: 2013:10s Kvalificering av elkomponenter i kärnkraftverk - Hantering av åldring Kjell Spång and Gunnar Ståhl SSM English The purpose of this report ... given in Part 2. This report is also available in Swedish: 2013:10s Kvalificering av elkomponenter i kärnkraftverk - Hantering av åldring...
Innehållstyp: Publikationer -
2013:14 Approaches used for Clearance of Lands from Nuclear Facilities among Several Countries – Evaluation for Regulatory Input
the specific site and on the expected future use of the land, for example farming or industrial use (i.e. green or brown field, respectively). This does however not exclude that general clearance levels ... the specific site and on the expected future use of the land, for example farming or industrial use (i.e. green or brown field, respectively). This does however not exclude that general clearance levels...
Innehållstyp: Publikationer -
2010:01 Licensing of safety critical softwarefor nuclear reactors
accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying ... accepted that the assessment of software cannot be limited to verification and testing of the end product, i.e. the computer code. Other factors such as the quality of the processes and methods for specifying...
Innehållstyp: Publikationer -
2014:58 Technical Note, Rock Mechanics - Assessing probability and extent of blind faults and fault-end growth around the KBS-3 repository at Forsmark – Main Review Phase
analysis of geological system behaviour. Simulation of the influence of the thermal phase showed that i) sub-vertical deformation zones parallel to the repository contour are stabilised, ii) sub-vertical ... analysis of geological system behaviour. Simulation of the influence of the thermal phase showed that i) sub-vertical deformation zones parallel to the repository contour are stabilised, ii) sub-vertical...
Innehållstyp: Publikationer -
2013:30 Laser pointers and Eye injuries - An analysis of reported cases
transient within a few days. It is also likely that such a visible injury to the retina becomes functional, i.e. prevents reading skills. What dosage is required for the disability to become permanent is not clear ... transient within a few days. It is also likely that such a visible injury to the retina becomes functional, i.e. prevents reading skills. What dosage is required for the disability to become permanent is not clear...
Innehållstyp: Publikationer -
2014:33 Technical Note, Reproduction of SKB’s Canister Failure Calculations - What-If and ‘Residual’ Scenario to Illustrate Barrier Functions
reference cases and selected what-if scenario cases. The what-if scenario cases we considered include (i) corrosion scenario with initial advection, (ii) corrosion scenario with faster spent nuclear fuel (SNF) ... reference cases and selected what-if scenario cases. The what-if scenario cases we considered include (i) corrosion scenario with initial advection, (ii) corrosion scenario with faster spent nuclear fuel (SNF)...
Innehållstyp: Publikationer