Visar 4684 sökträffar på ””
-
2010:33 Lineament interpretation Short review and methodology
This report concerns a study which was initially conducted for the Swedish Nuclear Power Inspectorate (SKI), which is now merged into the Swedish Radiation Safety Authority (SSM). The conclusions and viewpoints presented in the report are those of the author and do not necessarily coincide with those of the SSM. In the characterization of a site that may have potential for hosting a...
Innehållstyp: Publikationer -
2010:28 GEMA3D – landscape modelling for dose assessments
Post-closure safety assessments for nuclear waste repositories involve radioecological modelling for an underground source term. Following several decades of research and development, the Swedish Nuclear Waste Management Company (SKB) is approaching a phase of license application. According to SKB’s plans, an application to construct a geological repository will be submitted by the end of...
Innehållstyp: Publikationer -
2010:31 Buffer erosion: An overview of concepts and potential safety consequences
In its safety analysis SR-Can, SKB reported preliminary results and conclusions on the mechanisms of bentonite colloid formation and stability, with a rough estimate of the consequences of loss of bentonite buffer by erosion. With the review of SR-Can the authorities (SKI and SSI) commented that erosion of the buffer had the greatest safety significance, that the understanding of the...
Innehållstyp: Publikationer -
2010:30 INSITE Summary Report
SSM and its predecessor SKI employed a team of earth scientists who followed and reviewed SKB’s investigations of the potential spent nuclear fuel repository sites at Forsmark and Laxemar. This group was named INSITE (INdependent Site Investigation Tracking and Evaluation) and began its work in 2002 and completed its task with the review of the final versions SKB’s site descriptive models,...
Innehållstyp: Publikationer -
2011:03 On Decommissioning Cost for Nuclear Power Plants
This research report summarizes what has changed over the latest 15 years concerning actual and estimated costs for the D&D of nuclear power plants that have been shut down permanently. It also reports on the availability of detailed information for actual nuclear power plant D&D cost breakdowns. The results will be one supporting document in the review of the estimates submitted for...
Innehållstyp: Publikationer -
2012:21 Technical Note, Initial Review Phase for SKBs Safety Assessment SR-Site: Corrosion of Copper
The uniform and localized corrosion treatments as well as stress corrosion cracking positions currently considered by SKB have been examined with the objective of identifying key unresolved issues or gaps, needs and opportunities. In conjunction with the review of the SKB reports listed in Appendix 1, there has been some consideration of the broader literature. This summary highlights the...
Innehållstyp: Publikationer -
2010:12 An Evaluation of Models of Bentonite Pore Water Evolution
The pore-water composition of a KBS-3 bentonite buffer may gradually change as a result of reaction between groundwater and buffer minerals. The rather minor occurrences of the most rapidly reacting minerals in the buffer will have the most immediate and observable influences, but contributions from slow reactions of the main bulk clay phases cannot be ruled out. The performance implication...
Innehållstyp: Publikationer -
2007:09 DECOVALEX-THMC - Task C
This report describes the results of Task C1 of the international DECOVALEX– THMC project devoted to Excavation Damage Zone (EDZ) in argillaceous rock at the Tournemire site in France. Task C of the project is aimed to understand the physical phenomena induced by excavation in the argillaceous rock. The task is to develop adequate numerical models for interpretation of observed damaged zones...
Innehållstyp: Publikationer -
2010:25 Modelling Coupled Processes in the Evolution of Repository Engineered Barrier Systems using QPAC-EBS
Currently in Sweden, the SR-Site safety assessment for a spent nuclear fuel repository is being developed by the Swedish Nuclear Fuel and Waste Management Company (SKB). The planned SSM review of this work requires access to a sufficient modelling capability to assess the combined performance of the engineered barriers (spent fuel canister, buffer and backfill) and the natural geosphere...
Innehållstyp: Publikationer -
2007:07 DECOVALEX-THMC Project - Task A
This report presents the definition of the first phase, Task A-1, of the Task A of the international DECOVALEX project. The task is a working example of how interaction between THMC modelling and SA analysis could be performed. Starting with the technical definition of the Task A, the report presents the results of preliminary THM calculations with a purpose of an initial appreciation of the...
Innehållstyp: Publikationer