Sök

Din avgränsning ger 74 träffar.

Sortera på:

Relevans Datum
  • 2007:02 Stakeholder involvement in Swedish nuclear waste management

    SNF found three main reasons for considering the Forsmark site unsuitable for the location of SFR: i) bedrock condi- tions are worse in Forsmark compared to for instance Simpevarp and Studsvik, ii) the ... (SKB 1997: 21). At this time SKB considered the siting process to be based on the following steps: i) feasibil- ity studies (the proper number of these was later, in 1994, decided to be between 5 and 10)...

    Innehållstyp: Dokument
  • 2007:10 DECOVALEX-THMC - Task D

    944 kB ... Status Report for D_THC DOE Team (USA) Appendix H: Status Report for D_THC JNC Team (Japan) Appendix I: Status Report for D_THC BGR Team (Germany) 1 1. Introduction This status report summarizes...

    Innehållstyp: Dokument
  • 2007:11 Review of Quality Assurance in SKBs Repository Research Experiments

    253 kB ... are those of the author/authors and do not necessarily coincide with those of the SKI. i Executive Summary SKB is preparing licence applications for a spent nuclear fuel encapsulation plant...

    Innehållstyp: Dokument
  • 2007:31e Safety and Radiation Protection at Swedish Nuclear Power Plants 2006

    308 kB ... “service operations”. 2 Rask Analys av Störningar i Kärnkraftverk (Quick analysis of disturbance in a nuclear power plant) 7 Since the decision...

    Innehållstyp: Dokument