2012:59 Technical Note, Initial review phase – Dose Assessment Methodology
This report has been prepared as part of the Initial Review Phase of SKB’s SR-Site performance assessment of the long-term safety of the KBS-3 geological disposal facility (GDF) proposed for construction at Forsmark. The review addresses the methodology employed in the dose assessment calculations of SR-Site. In this respect the review has a natural focus upon biosphere modelling aspects of...
Innehållstyp: Publikationer -
2012:49 Hydrogeological characteristics of sites for low- and intermediate-level waste disposal
The Forsmark area with its selected two sites and the Laxemar-Simpevarp area with its two sites are broadly similar in terms of lithology, rock ages, and tectonic histories. The two areas differ in terms of degree of deformation, and tectonic fabric. Some lithologic and tectonic differences are noticeable between the two sites in the Forsmark area and between the two sites in the...
Innehållstyp: Publikationer -
2012:65 Technical Note, Review of the Nuclear Criticality Safety of SKB’s Licensing Application for a Spent Nuclear Fuel Repository in Sweden
The Swedish Nuclear Fuel and Waste Management Company in 2011 applied to the Swedish government for approval of a proposed solution for disposal of used fuel from Swedish nuclear power reactors and some relatively minor quantities of other fissile material. This Technical Note contains results of a recent nuclear criticality safety review of the overall prospects of the application being able...
Innehållstyp: Publikationer -
2012:61 Geochemical Constraints on Buffer Pore Water Evolution and Implications for Erosion
Mineralogical data from the Forsmark Site show that smectite and calcite occur at all depths in Forsmark fractures, with no evidence for removal/dissolution by previous glacial episodes. This natural analogue information implies that these minerals may not have been eroded/dissolved during previous glacial episodes. Available thermodynamic data suggest that repository-depth Forsmark...
Innehållstyp: Publikationer -
2012:64 Finansiella aspekter vid avveckling av kärnkraftverk (BWR)
I studien presenteras i vilka situationer som en parametrisk ansats är tillämplig. Resonemang sätts in i en autentisk kontext genom att referenser görs till de förberedande aktiviteter som idag genomförs vid Barsebäcksverket. En tentativ slutsats är att den valda metoden är lämplig för att göra uppskattningar av de framtida kostnader...
Innehållstyp: Publikationer -
2011:22 Infiltration of dilute groundwaters and resulting groundwater compositions at repository depth
The planned Swedish concept for final disposal of spent nuclear fuel includes copper canisters placed in deposition holes at about 500 m depth in granitic bedrock. The copper canisters will be surrounded by bentonite buffer with the objective of inhibiting groundwater flow adjacent to the canister. It has been discovered that dilute glacial melt-water may induce erosion of the buffer material.
Innehållstyp: Publikationer -
2012:09 Riktlinjer för utformning av strålskyddsprogram för transportörer av radioaktiva ämnen
Under åren har dosgränsen för personal som arbetar i verksamhet med joniserande strålning och allmänhet blivit allt lägre utan att krav på lägre dosrater på kollin innehållande radioaktiva ämnen har införts. Transporter av kollin med radioaktiva ämnen har hittills gett låga doser i flertalet fall, men ibland kan relativt höga...
Innehållstyp: Publikationer -
2012:17 Technical Note, Corrosion of copper canister
It is expected that the inflow of ground water to the deposition holes and tunnels in the Forsmark repository will be very slow. Thus, it might take some few hundred years up to thousand years before the deposition holes are filled with ground water and it might take 6000 years or more before the bentonite buffer is fully water saturated and pressurized. The copper canisters will therefore...
Innehållstyp: Publikationer -
2011:34 Evolution of hydrogen by copper in ultrapure water without dissolved oxygen
One result from this research was that the experimental difficulties of repeating Hultqvist and co-workers work are considerable and were initially underestimated. The main challenge was to obtain satisfactory tightness of all connectors involved in the experimental set-up. The problems with leakage resulted in that the research program originally planned for in this project had to be reduced...
Innehållstyp: Publikationer -
2011:10e Review and evaluation of the Swedish Nuclear Fuel and Waste Management Company’s RD&D Programme 2010. Statement to the Government and summary of the review report
In accordance with Section 25 of the Ordinance (1984:14) on Nuclear Activities (Nuclear Activities Ordinance), the Swedish Radiation Safety Authority (SSM) shall review and assess the research, development and demonstration programme (RD&D programme) that the reactor licensees are obligated to establish in accordance with the Act (1984:3) on Nuclear Activities (Nuclear Activities Act).
Innehållstyp: Publikationer